Building Permits and related information

Hooked on Lakeside

Are you building or remodeling ?

Do you need a permit ?

 

Do I Need A Permit?

When a permit is required

A building permit is required for new construction or if you’re making structural, plumbing, mechanical, or electrical changes to an existing building. You generally don’t need a permit for minor repairs and maintenance.

For example, you do need a permit to:

  • Add a room,
  • Build or alter a garage, carport or shed more than 200 square feet in size,
  • Cut a new window or door opening, or widen existing windows,
  • Install a wood stove, or
  • Build a retaining wall more than four feet high or that supports a bank of earth above the top of the wall.

You do not need a permit to:

  • Replace windows or doors with new ones that are the same size,
  • Put up shelves and cabinets,
  • Replace interior drywall or paneling,
  • Build a patio or deck (without a roof) that is less than 30 inches above grade.

Permits are required for any new construction or manufactured dwelling, as well as alterations or additions to existing buildings, including structural, plumbing, mechanical, electrical, boiler, and elevator work. The property owner or contractor is responsible for obtaining structural, mechanical, electrical, plumbing, and manufactured dwelling setup permits. However, there are some exceptions to permit requirements. More information is available on the State of Oregon Building Codes Division website. If you are not sure whether or not you need a permit, call the City of Lakeside Planning  Department at 541-759-3009. For information on Building Codes, please call Northwest Code Professionals at 541-484-9043. 

Some people mistakenly think they can save time and money by not getting a building permit. In reality, skipping the permit can cost you more time and money, and can endanger your property and your family’s safety. A building permit assures that your project will be inspected for compliance with the necessary state and local codes.

Planning

Before you start

Before you apply for a permit, check with the Planning Department to make sure that what you want to do is allowed on the property. There are restrictions based on zoning, lot coverage, setbacks, and other issues, and the Planners can help make sure that those requirements are met. While it’s not our job to design your project for you, our staff can help guide you through the process. If you don’t find what you need on this website, you’re welcome to call our office or make an appointment to visit us at City Hall. We’ll be happy to answer your questions and help move your project along.

If you’re building a new structure or addition, you’ll need to draw a site plan, which is an overall view of your lot and its structures. Your site plan does not need to be professionally drawn, but it should be drawn to scale. The easiest option is to draw your proposed building’s outline on a printout of an online map. A clear and accurate plan helps us process your application quickly. An incomplete plan is the #1 reason for delays in approving a permit.

Electrical & Plumbing

Wires & Pipes

All electrical and plumbing permits are issued by the City of Lakeside through the same process as Building and Mechanical permits.

Applying for a Permit

Every permit starts with an application

There can be many aspects to a building project. Some projects may require blueprints, architectural plans, or engineering plans. Others, such as partially re-roofing an existing structure, may require only a basic building permit. To find out what is necessary for your project, call our office or stop by the Community Development and Public Works office. It’s always better to ask questions first than to run into a surprise after you’ve begun the project.

Licensed contractors, architects, and engineers can apply for some types of permits using Oregon’s ePermitting system. If you're not one of these, or if you just prefer hard copies, you can fill out a form on paper. Permit applications are available at our office in City Hall and can be downloaded from our website.

Building Permit

Manufactured Building Placement Application

Sewer Permit Application
 

Some projects may need multiple permits. For example, adding a bathroom to an existing home typically requires a building permit for the structural components, a plumbing permit for any added plumbing, an electrical permit for any wiring, and a mechanical permit for an exhaust fan.

There are several ways to submit your completed permit application:

  • In person at City Hall 
  • By mail: City of Lakeside,  915 N. Lake Road,  Lakeside, Oregon  97449

Your permit cannot be reviewed until we receive your plan review fees. If you submit your application by mail or fax, you can either mail us a check or you can use a bank or credit card or please call our office for an estimate of the plan review and permit fees.

 

Issuing the Permit

Getting the paper in your hands

When your permit has been approved, our staff will contact you by phone and/or email and tell you that it is ready to issue. After you pay any remaining permit fees, the permit will be issued. You need to have the building permit and approval documents onsite during all phases of the construction and inspection process; you can pick up hard copies at City Hall

Construction must begin within 180 days of the permit being issued. You must build according to the plans you submitted with your application. If you need to make changes to your building plans, please call or visit our office. Any substantial change requires submitting a revised plan and may require additional fees.

If your project takes more than six months to complete, you’ll need to request an extension and schedule a progress inspection every six months until it is finished.

Inspections

Inspections are needed throughout the project

Once your permit is issued and you've started work, you'll need periodic inspections to ensure that the work is being done correctly.

The City’s building inspector will need to inspect the project to ensure the work is being done according to building codes and your approved plans. Required inspections will be listed on your permit. Be sure to have each inspection completed before going on to the next phase of the project. For example, framing needs to be approved before you begin installing drywall. The City of Lakeside Building Department will conduct all inspections related to those elements of your project. These inspections must be completed before the final inspection by the City’s inspector.

To request an inspection, please call our office at 541-484-9043. When you call, you will be asked for the permit number, property owner's name, project address, type of inspection needed, and date on which inspection is desired. Unless all of the work is outside and accessible, an adult needs to be at the site to provide access for the inspector. The building inspector is available two days a week.

Before scheduling an inspection, make sure the relevant phase of the project is ready to be inspected. If it is not ready when the inspector arrives, you may be charged additional fees.

No matter who applies for the permit, the property owner is ultimately responsible for making sure the project is completed and has a final inspection. If the work is being done by contractors, make sure they are scheduling inspections as needed, including the final inspection.

Don't assume the project is complete when the construction work is finished. You must have a final inspection to confirm your structure is safe and legal. Failing to schedule the final inspection could lead to big problems in the future. You could be subject to enforcement action and additional costs, and it could even compromise your ability to sell or refinance your property.

 

Permit Expiration

Keep the permit active

The best way to keep your permit from expiring is to make progress and have regular inspections as you work.

The first inspection must be within 180 days of the permit being issued. Once work has begun, the permit expires if no additional inspection has been done for 180 days or more. Inspections show that progress is being made on a permit, so if there are no inspections being done the permit may expire.

A permit expires when more than 180 days have elapsed without an inspection. There is no set deadline for finishing a project, as long as an inspection point is met every 180 days